top of page
  • Youtube
  • LinkedIn
  • Instagram
  • Pinterest
  • Facebook
Architect hold plans

Expert Council Approval Landscape Plans for Newcastle, Hunter & Central Coast

From Concept to Occupation Certificate (OC): Your Build Starts With Certified Compliance Documentation.

Securing development consent in the Newcastle, Hunter Region, or Central Coast demands technical precision. Your project—whether a single dwelling, a commercial development, or a complex multi-residential design—requires meticulous landscape documentation to satisfy local Council’s rigorous planning controls.

​

Struggling to ensure your Landscape Plans meet the strict requirements of the NSW SEPPs and local Council DCPs?

​

PARC Concepts specialises in technical landscape documentation and design, creating comprehensive, compliant landscape architecture drawings that meet the specific requirements of the NSW State Environmental Planning Policies (SEPPs), including the Housing SEPP, and all local Development Control Plans (DCPs). We provide certified Council Approval Landscape Plans that compliance with your Local Environmental Plan (LEP), Development Control Plan (DCP), and specific developer guidelines, ensuring fast-tracked approval for your project.

​

We deliver compliant, architecturally-aligned landscape design solutions across all local government areas, including the City of Newcastle, Lake Macquarie City Council, Maitland, Cessnock, and Port Stephens.

Urban Gardens

The Complete Scope of Our Council Approval Services 

White Fence

Mandatory Documentation for Structural & Site Integrity

Any development that significantly alters the site, impacts stormwater, or sits near boundaries requires a certified landscape plan to prove compliance and structural integrity. We produce comprehensive plans for applications involving the following key structural components:

Structural Application
Development Triggers
Swimming Pools & Swim Spas
Required for all new pools (DA or CDC) to document surrounding paving, fencing compliance, drainage, and soft landscaping ratio requirements.
Retaining Walls
Mandatory for walls over 600mm in height (or a cumulative height) and necessary for sloped sites to prove geotechnical stability and site drainage.
Decks, Patios & Pergolas
Required when structures exceed floor space ratios (FSR) or alter the soft-to-hard surface ratio (e.g., decks over 25m2 or over a certain height).
Outdoor Kitchens & Fireplaces
Required if permanently attached, plumbed, or wired, as they contribute to the total impervious surface area and FSR.
Driveways & Hardstand Areas
Documentation is mandatory for new or altered driveways to confirm materials, manage run-off, and ensure compliance with street setback and verge controls.
Courts & Fencing
Required for permanent recreational structures like Basketball Courts or Tennis Courts, and often for boundary fencing in new estates or high-impact zones.

Landscape Documentation for New Housing Estates

Many greenfield estates across the Hunter and Central Coast operate under a Design Review Committee (DRC) or specific developer covenants. Your standard Council application often requires an additional set of plans to satisfy these aesthetic and environmental guidelines.

Region
Key Estates We Service
Maitland / Hunter
Sophia Waters (Chisholm), Lochinvar Ridge, Heritage Parc, Huntlee, Avery's Rise (Heddon Greta).
Cessnock / Pokolbin
The Vintage (Pokolbin/Rothbury area).
Lake Macquarie
Billy's Lookout (Teralba), Trinity Point (Morisset).
Port Stephens
Pacific Dunes (Medowie), The Bower (Medowie).
Central Coast
Murrays Beach, Crangan Bay, Catherine Hill Bay.

Our plans ensure strict compliance with developer-mandated planting palettes (often native-first), fencing materials, and driveway setbacks.

Image by John Fornander
Modern Housing

Multi-Residential Compliance and Landscape Plans

Multi-unit developments—including Duplexes, Dual Occupancies, Granny Flats, Manor Houses, Townhouses, and Apartment buildings—are under intense scrutiny. We ensure compliance by detailing the following key elements:

Compliance Element
Documentation Requirement
Site Analysis & Context
Detailed plans showing existing trees and vegetation to be retained, site levels (AHD), and proximity to boundaries or easements.
Hard & Soft Landscaping Ratios
Clearly calculated areas of non-permeable (hardscaping) and permeable (soft landscaping) surfaces to comply with minimum landscaped area and stormwater management requirements.
Water Management & Drainage
Integration of Water Sensitive Urban Design (WSUD), specific details for sub-surface drainage (ag-pipe and pits), and rainwater harvesting to manage runoff.
Structural Elements
Technical details for all built features, including cross-sections and materials for fences, pergolas, pools, and essential retaining walls.
Planting Schedule & Canopy
A comprehensive list of proposed plants (botanical/common names, size, quantity) with calculated mature heights and canopy spread to demonstrate future tree coverage.
PPOS & Deep Soil Zones
Calculating and designing the Principal Private Open Space to meet minimum dimensions (e.g., > 4.0m wide) and detailing the mandated areas for deep soil planting.
Services Management
Strategic positioning of bins, clotheslines, and utilities, ensuring they are shielded from public view and comply with Waste Management Plans.
Access & Safety
Designing common property access, lighting plans, and passive surveillance features.

Educational & Early Childhood Space Plans

We are passionate about designing environments for the next generation. Our plans for New Schools, Primary Schools, and Early Childhood Education Centres (Daycares) meet strict compliance requirements while fostering child development. Our plans satisfy the requirements of the NSW Department of Education, local Council certifiers, and the NSW Planning Policy for Educational Establishments and Child Care Facilities.

We incorporate specific design elements for:

  • Sensory & Developmental Play: Integrating natural, tactile, and varied zones for physical and cognitive growth.

  • Safety & Accessibility: Ensuring all surfaces, structures, and sightlines comply with relevant Australian Standards and Work Health and Safety (WHS) requirements.

Aerial View of Playground
Image by Travis Fish

Tourism & Accommodation Landscaping

A high-quality landscape plan is a crucial investment for the growing Hunter Valley and Newcastle tourism sector, including Hotels, Resorts, Holiday Accommodation, and Wineries.

A professional landscape plan is required for consent and serves to:

  • Increase Investment Value: Enhancing guest experience, staff amenity, and increasing the overall appeal and booking value of the property.

  • Visitor Experience: Creating memorable arrival statements, safe and aesthetically pleasing pedestrian access, and feature gardens.

  • Safety & Exposure: Strategic lighting and planting for security and clear, attractive external signage for increased visibility.

Self-Storage and Industrial Landscape Plans

Commercial and industrial developments, such as self-storage facilities, warehousing, and light-industrial parks, require specific landscape plans to manage visual impact and screening.

These specialist plans focus on:

  • Boundary Screening: Developing landscape buffers and dense boundary planting plans that satisfy Council requirements for effective visual amenity screening from public roads and adjoining properties.

  • Acoustic Buffer Integration: Integrating landscape zones with acoustic walls or fencing where required for noise mitigation.

  • Heavy-Duty Hardscaping: Specifying durable, low-maintenance materials for large vehicle access, maneuvering areas, and fire access points.

Exterior of Modern Garage
Adjusting a Model

Navigating High-Impact Development Controls

The complexity of your landscape plan escalates significantly for certain development types. We have extensive experience in meeting the heightened controls for:

Project Type
Key Compliance Requirement
Multi-Residential (Dual Occupancy, Townhouses, Terraces, Duplex, Strata)
Principal Private Open Space (PPOS) and Communal Open Space. Ensuring accessibility, amenity, and solar access to all private and shared outdoor areas.
Institutional/Commercial (Educational Establishments, Health Services, Tourism Facilities)
Compliance with the State Environmental Planning Policy (Transport and Infrastructure) 2021 (T&I SEPP) regarding parking, setbacks, and pedestrian access.
Landform Change / Retaining Walls
Demonstrating structural integrity, proper drainage, and managing site cut and fill.

Seamless Integration of Pre-Construction Reports

To guarantee a smooth, fast-tracked approval process, we manage the integration and documentation of all preliminary and specialist reports necessary for a complete DA or CDC submission.

Document/Plan Name
Purpose & Integration
Site Survey (AHD) & EGL
Provides the Existing Ground Levels (EGL) and boundary data, essential for structural design and accurate cut/fill calculations.
Geotechnical & Structural Engineering
Assesses soil stability and provides certified designs/footing details for all retaining walls and structural elements, ensuring BCA compliance.
Arborist & Tree Protection Plans (AS 4970)
Details Tree Protection Zones (TPZ) and management of existing vegetation impacted by construction.
Bushfire Attack Level (BAL) Plans (AS 3959)
Documents the implementation of Asset Protection Zones (APZs) and specifies low-flammability plants and materials.
BASIX-Compliant Plans
Documents shade trees, water-efficient planting, and irrigation systems to meet BASIX requirements for new builds.
Engineer Condition/Forensic Reports
Establishes the necessary remediation strategy for sites with existing structural damage (e.g., failed retaining walls or land slip areas).
Residential Houses
House with Pool

Securing Your Project: Risk and Compliance Assurance

The Consequences of Non-Compliance

 

Submitting non-compliant or inadequate landscape plans will inevitably lead to a refusal or a Request for Further Information (RFI) from the council, resulting in significant delays and additional costs to your project. Crucially, a failure to meet your landscape conditions will result in the refusal of your Occupation Certificate (OC).

​

 

Common Reasons for Refusal/Delay in NSW:

 

  • Inadequate Canopy: Failure to demonstrate how the mature plant selection will achieve the minimum required tree canopy coverage for the site.

  • Missing Structural Details: Absence of cross-sections or lack of clarity on how retaining walls and earthworks will be stabilised and drained.

  • PPOS Breach: Non-compliance with the minimum area or dimension rules for Principal Private Open Space in multi-unit developments (e.g., Duplex, Townhouses).

  • BAL Conflict: Landscape elements, such as planting or mulch types, conflicting with the requirements of the Asset Protection Zone (APZ).

The Building Information Certificate (BIC)

What is Building Information Certificate and why do you need it?

 

A Building Information Certificate (BIC) is what you need when an unauthorised building or structure has been constructed without prior Council approval. Having to apply for a BIC is often the developer or homeowner's biggest long-term regret.

It is the worst long-term subscription because it is often the final, painful step to retroactively legalise a non-compliant element—like an unapproved retaining wall or deck—that should have been approved during the original consent phase. It involves significant costs, engineer reports, and regulatory stress.

​

The BIC's true cost lies in the ongoing uncertainty and depreciation:

  • Affects Resale Value: A BIC often forces the seller to disclose the unauthorised status, leading to major complications during conveyancing. This can significantly devalue the property or result in a lower sale price as buyers factor in the cost and risk of future rectification.

  • Limits Marketability: Depending on the severity of the non-compliance, the existence of a BIC can make the property very difficult or impossible to sell to a buyer seeking finance or certainty.

  • The Recurring Cost: The certificate is not permanent. You are required to periodically renew the BIC (often every seven years), forcing you to pay fees and potentially commission new engineer reports, effectively turning the non-compliant structure into a recurring expense.

Don't risk costly delays or the need for a BIC. Engage a professional to ensure your landscape vision meets all local council and state planning requirements from day one.

Luxury Backyard
Modern Architecture

Why Choose PARC Concepts?

Site-Sensitive Design

From sloped acreage to coastal zones, every site is carefully assessed for climate, soil, sun direction, and structure.

Sustainability at the Core

Water-wise plant choices, native selections, and optional smart tech integration for irrigation and lighting.

DA/CDC Ready Documentation

Full drawing sets, planting schedules, and engineering-ready documentation where required.

Architectural Integration

our outdoor spaces will feel like a natural extension of your home’s architecture, never an afterthought.

Let’s Design Your Landscape with Purpose

Stop waiting for design amendments. If you are an architect, builder, developer, or homeowner in the Newcastle, Hunter, or Central Coast area, trust PARC Concepts to deliver compliant, certified, and buildable landscape documentation.

Contact us today to secure your Council Approval Landscape Plans and keep your project moving forward.

DA & CDC Landscape Plans FAQ

Do I Need a DA or CDC Landscape Plan for My Project?

Most councils and certifiers require a landscape plan where development affects site layout, drainage, site coverage, or private open space.

This commonly applies to pools, retaining walls over 600mm, driveways, decks contributing to floor space ratio (FSR), and multi‑dwelling developments.

Landscape plans are used to demonstrate compliance with stormwater management, deep soil and permeable surface requirements, privacy screening, and tree protection controls. Even where architectural works appear minor, landscape documentation is often the trigger for compliance under DA or CDC pathways, helping avoid redesign during assessment and reduce compliance issues during construction.

PARC Concepts prepares landscape plans for Development Applications (DA), Complying Development Certificates (CDC), and exempt development, with scope aligned precisely to the approval pathway being pursued.

Which Projects Require a Landscape Plan?

Landscape plans are typically required where development triggers planning controls or affects how the site functions.

This commonly applies to:

​

 

Even where works appear minor, councils often assess cumulative impacts such as stormwater runoff, tree removal, or loss of permeable surfaces. Estate‑controlled developments almost always require formal landscape documentation regardless of approval pathway.

Do I Need a Landscape Plan for a Pool in NSW?

Most swimming pool approvals in NSW require a landscape plan, particularly where the pool affects site coverage, drainage, or private open space.

Landscape plans are typically required to demonstrate:

​

  • Compliance with deep soil and permeable surface requirements

  • Drainage and stormwater management

  • Tree protection and boundary setbacks

 

Even for smaller pools, landscape plans are commonly required under both DA and CDC pathways to avoid compliance issues during construction.

What Has to Be Shown on a Landscape Plan for Council?

A council‑compliant landscape plan must clearly show how the site meets planning controls, environmental requirements, and construction feasibility.
 

A compliant landscape plan typically includes:

  • Site boundaries, existing conditions, and finished levels (AHD)

  • Tree locations, Tree Protection Zones (TPZs), and any approved removals

  • Calculated hard and soft landscape areas, including permeable surfaces

  • Planting schedules showing botanical names, pot sizes, quantities, and canopy intent

  • Drainage strategies, surface falls, and integration with site stormwater systems

  • Structures such as fences, retaining walls, pools, bins, clotheslines, and services

  • Principal Private Open Space (PPOS) dimensions and deep soil zones where applicable


Council and certifier reviews focus on whether the plan can be built exactly as shown. Plans that lack quantified areas, finished levels, or canopy intent frequently result in RFIs or redesign during assessment.

What Documents Do I Need to Provide?

To prepare an accurate and approval‑ready landscape plan, the following documents are typically required:
 

  • Registered land survey showing boundaries and AHD levels

  • Architectural plans (floor plans, elevations, and sections)

  • Estate or developer guidelines or covenants, where applicable


Depending on site constraints, additional documentation may be required, including:
 

  • Geotechnical report or site soil classification, particularly for retaining walls, pools, or cut and fill

  • Flood report if the site is located within a flood planning area

  • Bushfire assessment (BAL report) for bushfire prone land

  • Heritage report or heritage impact statement where the property is heritage‑listed or within a conservation area


Early coordination of these inputs helps avoid redesign, RFIs, or approval delays.

How Long Does It Take to Prepare a DA or CDC Landscape Plan?

Timeframes depend on site complexity, approval pathway, and documentation quality.

In most cases:
 

  • First draft issued within 5–10 business days once required inputs are received

  • Final plans completed within 2–3 weeks, including coordination and revisions


Projects involving steep sites, pools, retaining walls, bushfire, flood, heritage constraints, or multi‑dwelling layouts may require additional technical coordination prior to lodgement.

How Much Does a DA or CDC Landscape Plan Cost?

Landscape plan fees vary based on site size, approval pathway, and technical constraints.

Factors influencing scope and cost include:
 

  • Steep or irregular sites

  • Pools, retaining walls, or complex drainage

  • Bushfire, flood, or heritage overlays

  • Estate or developer design review controls (DRC)

  • Multi‑residential or strata developments

  • Integration with WSUD, drainage, or arborist requirements


As a general guide, DA or CDC landscape plans typically start from around $1,400 + GST, with scope adjusted based on project complexity and approval requirements.

Where a Construction Certificate (CC) is required following DA approval, CC landscape documentation is prepared based on the DA‑approved plans and council conditions, not as a new design scope.

Can I Change My Landscape Plan After DA or CDC Approval?

Changes are possible, but they must not affect compliance with the approved plans.

Minor changes, such as plant substitutions that maintain the approved intent, are usually acceptable. However, changes to levels, drainage, hard and soft landscape areas, tree retention, or structures may trigger non‑compliance.

Under a CDC, any variation from the approved plans can invalidate the certificate. Under a DA, changes typically require a formal modification approval before construction continues.

Confirming changes early with your certifier or council helps avoid delays, stop‑work notices, or costly rework.

DA vs CDC vs Exempt Development — What’s the Difference?

Development Applications (DA) are assessed by council and are generally required for more complex or higher‑impact developments. A DA approval must always be followed by a Construction Certificate (CC) before any building work can commence.

Complying Development Certificates (CDC) combine planning and construction approval into a single process. Once a CDC is approved and pre‑commencement conditions are met, construction can begin immediately without a separate CC.

Exempt development applies to minor works that meet strict criteria and do not require formal approval.

The approval pathway determines how strictly landscape compliance is assessed and how changes can be managed during construction.

When Is a Landscape Plan Required for CDC?

A landscape plan is required for CDC where proposed works must clearly demonstrate compliance with criteria such as:
 

  • Site coverage and permeable surface limits

  • Drainage and stormwater flow

  • Tree removal or proximity to structures

  • Private open space requirements


CDC approvals rely on strict compliance. The landscape plan must clearly demonstrate that all conditions are met before approval can be issued.

Can My Builder or Architect Prepare a Landscape Plan?

In NSW, landscape plans submitted for DA or CDC approval are typically expected to be prepared by a suitably qualified landscape professional, such as a Landscape Architect or qualified Landscape Designer.

While builders or architects may prepare basic landscape drawings, council and certifier requirements often extend beyond simple layouts. Approval‑ready landscape plans must demonstrate compliance with planning controls, environmental requirements, and construction feasibility.
 

A compliant landscape plan commonly requires:
 

  • Detailed planting plans and schedules

  • Accurate level, surface, and drainage coordination

  • Deep soil and permeability calculations

  • Tree protection zones and canopy planning

  • Integration with site constraints such as bushfire, flood, or heritage controls


For projects involving pools, retaining walls, sloping sites, or development approvals, plans prepared by a qualified landscape consultant help reduce RFIs, redesign, and delays during approval.

What’s the Difference Between a Concept Landscape Plan and a DA Landscape Plan?

A concept landscape plan shows general layout and design intent and is typically used early in the design process.

A DA landscape plan is a compliance document. It must demonstrate:
 

  • Exact dimensions and site coverage

  • Finished levels and drainage behaviour

  • Planting schedules and canopy outcomes

  • Alignment with planning controls and approval conditions


Councils and certifiers assess DA landscape plans based on whether they can be built exactly as documented, not just the design intent.

Do I Need a Section 10.7 Certificate Before Starting?

Yes. A Section 10.7 Planning Certificate (formerly Section 149) identifies planning controls and site constraints that determine whether a project qualifies for DA, CDC, or exempt development.

It may flag bushfire, flood, heritage, or overlay constraints that directly shape landscape requirements. Landscape plans prepared without reference to these controls frequently require amendment once assessment begins.

Why Does a Well‑Prepared Landscape Plan Matter for Approval?

A well‑prepared landscape plan helps demonstrate compliance clearly, reducing the likelihood of RFIs, redesign, or delays during assessment.

It also ensures that drainage, levels, and planting outcomes are coordinated before construction begins, helping avoid costly changes or compliance issues later in the project.

bottom of page