Create Your First Project
Start adding your projects to your portfolio. Click on "Manage Projects" to get started
Hastings Project – Acreage Landscape Documentation Within Coastal Wetland & Bushfire Constraints
Project type
Residential Development Application (DA) – Landscape Documentation for Alterations & Additions to an Existing Acreage Property
Site Area
7,334 m² (two lots held and managed as a single property)
Development
Alterations and additions to an existing residence including:
Swimming pool
Private home tennis court
Pergola and associated landscape works
Bushfire planning considerations
Environmental constraint management
Stormwater infrastructure integration
Environmental Constraints
Mapped Coastal Wetland
Biodiversity Values mapping
Bushfire Prone Land
Existing vegetation retention requirements
Tree removal considerations
Viewline management requirements
Restricted development footprint outside environmental constraints
Stormwater and drainage requirements
Existing topographical conditions
Site Statistics
Total Property Area
7,334.0 m²
Coastal Wetland / Biodiversity Area
5,266.8 m²
Usable Area Outside Environmental Constraints
2,067.2 m²
Approximately 72% of the property was affected by mapped Coastal Wetland and Biodiversity Value constraints, significantly reducing the area available for development and landscape improvements.
Outcome
DA-ready landscape documentation balancing environmental protection, bushfire requirements, stormwater management, tree retention, landscape compensation, outdoor recreation and long-term site usability within a heavily constrained acreage property.
Location
Central Coast NSW (C2 + R2)
Date
April 2026
Related Service
Related Case Study
When Most Of The Property Cannot Be Developed: Designing Around Coastal Wetland & Bushfire Constraints
Related Location
Project Overview
Large acreage properties are often perceived as providing unlimited development opportunities.
In reality, environmental constraints can significantly reduce the usable portion of a site and dramatically influence where development, planting and landscape improvements can occur.
This Central Coast project involved two adjoining lots held and managed as a single property. While the total site exceeded 7,300m², more than 5,200m² fell within mapped Coastal Wetland and Biodiversity Value areas, leaving less than one-third of the property available for development and landscape works.
The proposed works included upgrades to the existing residence, outdoor entertaining areas, swimming pool and recreation facilities while navigating environmental protection requirements, bushfire considerations and vegetation management constraints.
Key Design Constraints
The project involved balancing several competing requirements:
Mapped Coastal Wetland constraints
Biodiversity protection requirements
Bushfire Prone Land considerations
Existing vegetation management
Tree retention and removal requirements
Limited developable land despite a large overall property size
Swimming pool integration
Recreation area planning
Stormwater infrastructure requirements
Long-term landscape maintenance and functionality
Design Response
1. Understanding The True Usable Site Area
One of the most significant planning challenges was recognising that the entire site could not be treated as developable land.
Although the property exceeded 7,300m², mapped Coastal Wetland and Biodiversity Value constraints covered the majority of the landholding. Landscape calculations and design decisions therefore focused on the smaller area available outside the protected environmental zones.
This fundamentally changed how development opportunities were assessed across the property.
2. Working Around Coastal Wetland Constraints
No landscape works were proposed within mapped Coastal Wetland areas.
Instead, the landscape strategy focused on protecting environmentally sensitive land while accommodating required improvements within the developable portion of the site.
The project demonstrates how environmental overlays do not simply influence planting decisions—they can dictate where development can and cannot occur.
3. Tree Removal, Compensation & Environmental Protection
An additional challenge involved balancing tree removal requirements with environmental constraints and site functionality.
While tree removal can often be compensated through replacement planting, this becomes more complicated when:
Large portions of a property are protected environmental land
Bushfire requirements influence vegetation management
Asset Protection Zones need to be maintained
New built structures reduce available planting opportunities
In this case, replacement planting needed to be carefully considered alongside bushfire planning, usable landscape space and long-term management objectives.
4. Bushfire Planning & Landscape Design
The site was also affected by Bushfire Prone Land requirements.
This created an additional layer of complexity, as vegetation objectives needed to be balanced against:
Asset Protection Zone requirements
Viewline management
Ongoing vegetation maintenance
Future safety obligations
The project highlighted how landscape design within bushfire-prone areas often requires a different approach to planting and vegetation management than conventional residential projects.
5. Integrating Outdoor Lifestyle Features
The proposed improvements included a swimming pool and outdoor recreation facilities.
The challenge was not simply finding space for these elements, but integrating them into a site already constrained by environmental mapping and bushfire considerations.
Each design decision needed to consider:
Available developable land
Existing vegetation
Future maintenance requirements
Environmental protection obligations
Long-term usability
6. Stormwater & Site Infrastructure
The landscape documentation also coordinated stormwater infrastructure, drainage requirements and associated site works.
Rather than treating landscape proposals as an isolated design exercise, the project integrated environmental planning, stormwater management and outdoor amenity into a coordinated landscape response.
Technical Resolution
Key outcomes achieved through the landscape design included:
Recognition of environmental constraints across the broader site
Protection of mapped Coastal Wetland areas
Coordination of bushfire planning requirements
Assessment of tree retention and removal implications
Integration of stormwater infrastructure
Accommodation of outdoor recreational facilities
Landscape planning across a constrained developable area
DA-ready landscape documentation
Outcome
The final landscape strategy balanced environmental protection, bushfire requirements and outdoor lifestyle objectives within a highly constrained acreage property.
Rather than focusing solely on planting design, the project required careful coordination between environmental mapping, vegetation management, development opportunities and long-term site functionality.
The result was a landscape response that acknowledged the realities of the site while supporting the client's vision for the property.
Project Insight
Large properties are not always easy properties.
This project demonstrates how environmental constraints can fundamentally change the way a site is planned and developed.
When Coastal Wetland mapping, biodiversity considerations, bushfire planning, vegetation management and outdoor amenity requirements all intersect, landscape design becomes a process of balancing competing objectives rather than simply allocating planting areas.
The project highlights the role landscape documentation can play in helping navigate complex environmental and planning constraints while still delivering practical outcomes for property owners.